Home
  Latest News
  Contact Us
 
Boat Building, Servicing, Dry Dock and Marine Products    
Home > > MFV Mark Amay up on Synchrolift at Mooney Boats Ltd

MFV Mark Amay up on Synchrolift at Mooney Boats Ltd

MFV Mark Amay up on Synchrolift at Mooney Boats Ltd

The MFV Mark Amay was lifted out on the 21st April 2012 for her annual dry-dock. With a draft of almost 5.8m she is one of the most difficult vessels to get up on the Synchrolift in Killybegs. But with a great deal of effort the vessel was lifted where she had her hull washed down and then repainted. While the vessel was out of the water Mooney Boats Ltd repaired damaged to the bow section of the vessel and the tail-shaft was also removed to new seals were fitted. Repairs were made to the vessels nozzle and also new anodes were supplied and fitted as required. The vessel was put back into the water on the 8th May and is now fishing for prawns of the west coast of Ireland.
 
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
  •  
   
 
St. Catherines Road, Killybegs, Co Donegal, Ireland. Ph: 074 9731152 Fax: 074 9731632 Email: info@mooneyboats.ie
Powered By Raindance CMS